ERP Requirements Traceability Matrix
Trace every ERP requirement from workshop to design, build, test and UAT sign-off, with fit-gap classification, automatic trace checks and a change log.
FreeFree Excel workbook. Trace every ERP requirement from workshop to design, build, test and UAT sign-off, with fit-gap classification, automatic trace checks and a change log. Download it, add your project details and use it today: no sign-up for software, no paywall.
A working requirements traceability matrix for Dynamics 365 and other ERP programs. Each requirement is tagged to an end-to-end process from the Microsoft business process catalog, classified by fit or gap, and linked to its design document, build work item and test cases. Built-in formulas flag requirements with missing design or test links and items that have gone stale. A change log captures every change to approved scope, and the summary sheet gives you fit rate, trace coverage, test status and UAT sign-off counts for steering committee reporting. Use it from discovery through go-live.
What's inside
- Requirements Traceability: One row per requirement. Trace each one from source to design, build, test and sign-off.
- Change Log: Record every change to an approved requirement. Link back to the Req ID.
- Summary: key numbers calculated automatically from your data
- Drop-down lists, worked example rows and formulas you can rely on
How to use it
- Agree an ID convention before the first workshop, for example REQ-<process code>-<number>, and never reuse a retired ID.
- Capture each requirement as one testable statement of business need. Split compound requirements into separate rows.
- Tag each row to an end-to-end process (L1) and business process (L3) so the matrix lines up with your process catalog.
- Classify fit or gap during fit-gap sessions and record the solution approach in one or two plain sentences.
- Add the design document reference, build work item and test case IDs as they are created. The Trace check column shows what is still missing.
- Log every change to an approved requirement on the Change Log sheet and record the decision and who made it.
- Review the Summary sheet weekly. Before UAT exit, every Must requirement should show Trace check = Complete and UAT sign-off = Signed off.
Who it's for
Project managers, solution architects, functional consultants and client-side leads who want their ERP program to go live on time and actually deliver value.
Let's connect
I'm Pranshu Shubham, a Microsoft Dynamics 365 F&O Solution Architect and PMP-certified program lead with 8+ years of ERP and AI transformation across the USA, Europe and APAC. I created this resource from real project experience, and I'd love to hear how you use it.
- Connect with me on LinkedIn and tell me what you're working on
- Have a question or a project in mind? Send me a message. I reply within 24 hours
- Explore more free e-books, templates and videos and the latest articles